This document contains the complete public packet for the Town Council meeting of August 26, 2026. It has been converted from the original PDF to accessible HTML format in compliance with WCAG AAA standards and ADA Title II requirements. This packet concerns a single project item: the Shades Subdivision Improvements Project, Phase 2 — final Change Order and final Pay Request, with supporting documentation.

Change Order No. 2 — Summary (EJCDC C-941)

Packet Page 1

Change Order No. 2 — Header Information
FieldValue
Change Order No.2
Date of IssuanceAugust 25, 2026
Effective DateN/A
OwnerTown of Cedar Lake
Owner's Contract No.N/A
ContractorRieth Riley Construction Co., Inc.
Contractor's Project No.N/A
EngineerChristopher B. Burke Engineering, LLC
Engineer's Project No.230324
ProjectShades Subdivision Improvements Project, Phase 2
Contract NameN/A

The Contract is modified as follows upon execution of this Change Order:

Description: This change order represents a final balancing of all contract items in this contract based on final field measured quantities.

Attachments: CO2 Table with summary of adjusted items (see following section).

Change in Contract Price
ItemAmount
Original Contract Price$1,540,184.18
Increase from previously approved Change Orders No. 1 to No. 2$69,162.55
Contract Price prior to this Change Order$1,609,346.73
Decrease of this Change Order$44,349.96
Contract Price incorporating this Change Order$1,564,996.77
Change in Contract Times
ItemValue
Original Contract Times — Substantial CompletionDecember 29, 2025
Original Contract Times — Ready for Final PaymentJanuary 19, 2026
Change from previously approved Change Orders — Substantial CompletionN/A
Change from previously approved Change Orders — Ready for Final PaymentN/A
Contract Times prior to this Change Order — Substantial CompletionDecember 29, 2025
Contract Times prior to this Change Order — Ready for Final PaymentJanuary 19, 2026
Contract Times with all approved Change Orders — Substantial CompletionJuly 2, 2026
Contract Times with all approved Change Orders — Ready for Final PaymentJuly 23, 2026

Signatures:

  • Recommended by Engineer (if required): T.J. Gordon, Construction Engineer, signed 08/25/2026
  • Accepted by Owner (Authorized Signature): not yet signed on this document
  • Accepted by Contractor (Authorized Signature): Tyler Platusic, Project Manager, signed 8/25/2026
  • Approved by Funding Agency (if applicable): N/A

Change Order No. 2 — Summary of Adjusted Items

Packet Page 2

The following table lists each contract bid item whose final measured quantity (and, for asterisked items, unit price) differed from the original plan quantity, resulting in the final balancing adjustment of Change Order No. 2.

Change Order No. 2 — Summary of Adjusted Items (Final Balancing)
Item No.Item DescriptionUnitOriginal Unit PriceOriginal Plan QuantityAuthorization QuantityRevised Unit PriceAuthorization AmountRevised Contract Amount
4TREE, REMOVEEACH$850.0040$850.00($3,400.00)$3,400.00
5*PCCP, REMOVESYS$60.0018994.03$62.00($5,888.14)$11,718.00
8TREE, PROTECT, UNDISTRIBUTEDEACH$250.0050$250.00($1,250.00)$1,250.00
10FENCE, REMOVE AND RESETLFT$85.00570$85.00($4,845.00)$4,845.00
11SIGN AND POST, REMOVE AND RESETEACH$500.0050$500.00($2,500.00)$2,500.00
13*COMPACTED AGG., NO. 2 FOR UNDERCUT (UNDISTRIBUTED)TON$44.00335497.54$46.25$7,517.48$15,493.75
14*COMPACTED AGG., NO. 53 FOR UNDERCUT (UNDISTRIBUTED)TON$40.00335231.25$42.25($4,383.44)$14,153.75
15SILT FENCELFT$1.502,5401,327$1.50($1,819.50)$3,810.00
17TEMPORARY SEED MIXTURELBS$1.931000$1.93($193.00)$193.00
20GEOGRID, TYPE 1SYS$1.306,3506,241.72$1.30($140.76)$8,255.00
21*COMPACTED AGGREGATE NO. 53 BASETON$43.003,5003,829.08$45.25$14,890.87$158,375.00
22*MILLING ASPHALT, 2 INSYS$3.304,4104,820.50$3.50$1,436.75$15,435.00
23*HMA PATCHING, TYPE B, UNDISTRIBUTEDTON$155.001500$159.00($23,850.00)$23,850.00
24*HMA INTERMEDIATE, TYPE BTON$92.00870846.29$100.00($2,371.00)$87,000.00
25*HMA SURFACE, TYPE BTON$98.00940971.52$108.00$3,404.16$101,520.00
26ASPHALT FOR TACK COATSYS$1.009,40010,048.07$1.00$648.07$9,400.00
27*RESTORATION, TYPE I (TOPSOIL, SEEDING, & ECB)SYS$12.502,8752,996.64$12.80$1,556.99$36,800.00
28*RESTORATION, TYPE II (TOPSOIL, SEEDING, & TRM)SYS$22.871350$23.30($3,145.50)$3,145.50
29*SWALE GRADING, UNDISTRIBUTEDLFT$20.00250380$20.50$2,665.00$5,125.00
30PLANT, DECIDUOUS TREE, 3.5 IN, UNDISTRIBUTEDEACH$1,000.0050$1,000.00($5,000.00)$5,000.00
31CONCRETE, SIDEWALK, 4 INSYS$83.00416.60$83.00$1,045.80$332.00
32CURB AND GUTTER, CONCRETE, ROLL CURBLFT$25.005,5405,590$25.00$1,250.00$138,500.00
33PCCP SHOULDER, 9 INLFT$25.00547530$25.00($425.00)$13,675.00
34*HMA FOR APPROACHES, TYPE BSYS$168.00611716.50$180.00$18,990.00$109,980.00
35PCCP FOR APPROACHES, 6 INSYS$84.10161127.20$84.10($2,842.58)$13,540.10
36*COMPACTED AGGREGATE FOR APPROACHES, 6 INTON$152.0069$158.00$474.00$948.00
37RIPRAP, REVETMENTSYS$165.007586.52$165.00$1,900.80$12,375.00
41PIPE, TYPE 2, 4 IN, UNDISTRIBUTEDLFT$18.0010088$18.00($216.00)$1,800.00
42PIPE, TYPE 2, 6 IN, UNDISTRIBUTEDLFT$25.00500$25.00($1,250.00)$1,250.00
43PIPE, TYPE 2, DIP, 12 INLFT$190.005557.20$190.00$418.00$10,450.00
44PIPE, TYPE 2, CONCRETE, 12 INLFT$104.00590547.50$104.00($4,420.00)$61,360.00
45PIPE, TYPE 2, CONCRETE, 18 INLFT$135.00726679.50$135.00($6,277.50)$98,010.00
46PIPE, TYPE 2, CONCRETE, 24 INLFT$148.00308277$148.00($4,588.00)$45,584.00
48FLARED END SECTION, 12 IN W/ GRATEEACH$2,000.0043$2,000.00($2,000.00)$8,000.00
55SANITARY SERVICE CONNECTION, TYPE 1, (UNDISTRIBUTED)EACH$1,100.00102$1,100.00($8,800.00)$11,000.00
56SANITARY SERVICE CONNECTION, TYPE 2, (UNDISTRIBUTED)EACH$1,500.00101$1,500.00($13,500.00)$15,000.00
57THERMOPLASTIC, SOLID WHITE, 4 IN, RECESSEDLFT$1.812,8653,593$1.81$1,317.68$5,185.65
58THERMOPLASTIC, SOLID YELLOW, 4 IN, RECESSEDLFT$1.812,6403,310$1.81$1,212.70$4,778.40
59TRANSVERSE MARKING, THERMOPLASTIC, STOP BAR, WHITE, 24 INLFT$13.582628$13.58$27.16$353.08
TOTAL (Authorization Amount)($44,349.96)

Items marked with an asterisk (*) in the original table reflect items whose unit price was also revised as part of Change Order No. 1.

Change Order No. 2 — Contract Value Reconciliation
ItemAmount
Awarded Contract Value$1,540,184.18
+ Previous Change Orders Value (CO #1)$69,162.55
= Contract Value Prior to this Change Order$1,609,346.73
+ Change Order #2 Value($44,349.96)
= Current Contract Value$1,564,996.77

CBBEL Transmittal Letter — Pay Request No. 5 (Final)

Packet Pages 3–4

Christopher B. Burke Engineering, LLC
214 South Main Street, Suite 201, Crown Point, IN 46307 — 219.663.3410 — cbbel-in.com

August 26, 2026

Town Council
Town of Cedar Lake
7408 Constitution Avenue
P.O. Box 707
Cedar Lake, Indiana 46303

Attention: Jennifer Sandberg – Clerk-Treasurer

Subject: Shades Phase 2 Subdivision Improvements, Pay Request No. 5 (CBBEL Project No. 230324)

Dear Town Council Members:

Christopher B. Burke Engineering, LLC (CBBEL) has reviewed final Pay Request #5 in the amount of $787,524.96 submitted by Rieth Riley Construction Co., Inc. dated 8/14/2026 with revised documentation received 8/26/2026. Based on the completed, measured, and observed work up to date, CBBEL recommends payment in the following amount:

Total Improvements — Pay Request No. 5
ItemThis EstimateTo Date
Value of Work Completed$728,916.99$1,564,996.77
Less Retainage$0.00$0.00
Balance$728,916.99$1,564,996.77
Less Previous Paymentsn/a$752,471.81
Liquidated Damages Assessedn/a($25,000.00)
Amount Due This Paymentn/a$787,524.96

Please find attached copies of the final Invoice #5 request from Rieth Riley and the Pay Estimate #5 Report from CBBEL. The final waiver of lien for pay app #5 from Rieth Riley is also attached. Rieth Riley will be sending over the referenced sub-contractor final waivers of lien to the Town and Burke once available for our records.

If you have any questions or concerns, please do not hesitate to call.

Sincerely,
Thomas J. Gordon
Civil/Construction Engineer & Project Manager

Encl.: As noted.
cc: Monica Horta – Town Administrative Assistant; Tim Kubiak – Town Operations Director; Tyler Platusic – Rieth Riley PM; Rebecca Sassman – Rieth Riley PA


CBBEL Pay Estimate Report No. 5 (Final) — Full Line-Item Detail

Packet Page 5

This is the authoritative, complete item-by-item breakdown of the contract. It is the single full reproduction of the 60-item schedule of values for this pay request; the AIA G703 Continuation Sheet and the Contractor's own Progress Estimate/Invoice (below) present essentially the same 60 items a second and third time in the original packet, so those sections are presented in summary form with a reference back to this table, to avoid tripling identical figures.

CBBEL Pay Estimate Report No. 5 (Final) — Shades PH 2 Subdivision Improvements, Contractor: Rieth Riley Construction Co., Inc. (CBBEL Project No. 230324)
ItemDescriptionContract QtyUnitContract Unit PriceContract CostRevised Unit PriceRevised Contract CostQty This InvoiceAmount This InvoiceQty To Date% UtilizedContract Amount To Date
1*MOBILIZATION AND DEMOBILIZATION1LS$95,500.00$95,500.00$107,050.00$107,050.000.40$42,820.001100.0%$107,050.00
2*CONSTRUCTION ENGINEERING1LS$47,660.00$47,660.00$50,090.00$50,090.000.40$20,036.001100.0%$50,090.00
3CLEARING RIGHT OF WAY1LS$13,500.00$13,500.00$13,500.00$13,500.001$13,500.001100.0%$13,500.00
4TREE, REMOVE4EACH$850.00$3,400.00$850.00$3,400.000$0.0000.0%$0.00
5*PCCP, REMOVE189SYS$60.00$11,340.00$62.00$11,718.003.03$187.8694.0349.8%$5,829.86
6PIPE, REMOVE130LFT$40.00$5,200.00$40.00$5,200.000$0.00130100.0%$5,200.00
7STRUCTURE, REMOVE2EACH$2,500.00$5,000.00$2,500.00$5,000.000$0.002100.0%$5,000.00
8TREE, PROTECT, UNDISTRIBUTED5EACH$250.00$1,250.00$250.00$1,250.000$0.0000.0%$0.00
9*EXCAVATION, COMMON3,000CYS$33.00$99,000.00$35.50$106,500.0096.57$3,428.243,000100.0%$106,500.00
10FENCE, REMOVE AND RESET57LFT$85.00$4,845.00$85.00$4,845.000$0.0000.0%$0.00
11SIGN AND POST, REMOVE AND RESET5EACH$500.00$2,500.00$500.00$2,500.000$0.0000.0%$0.00
12UTILITY VERIFICATION POTHOLING (UNDISTRIBUTED)10EACH$400.00$4,000.00$400.00$4,000.000$0.0010100.0%$4,000.00
13*COMPACTED AGG., NO. 2 FOR UNDERCUT (UNDISTRIBUTED)335TON$44.00$14,740.00$46.25$15,493.7580.78$3,736.08497.54148.5%$23,011.23
14*COMPACTED AGG., NO. 53 FOR UNDERCUT (UNDISTRIBUTED)335TON$40.00$13,400.00$42.25$14,153.750$0.00231.2569.0%$9,770.31
15SILT FENCE2,540LFT$1.50$3,810.00$1.50$3,810.001,327$1,990.501,32752.2%$1,990.50
16INLET PROTECTION20EACH$250.00$5,000.00$250.00$5,000.0020$5,000.0020100.0%$5,000.00
17TEMPORARY SEED MIXTURE100LBS$1.93$193.00$1.93$193.000$0.0000.0%$0.00
18PIPE PROTECTION2EACH$500.00$1,000.00$500.00$1,000.000$0.002100.0%$1,000.00
19*MAINTENANCE OF EROSION CONTROL DEVICES1LS$10,000.00$10,000.00$10,500.00$10,500.001$10,500.001100.0%$10,500.00
20GEOGRID, TYPE 16,350SYS$1.30$8,255.00$1.30$8,255.000$0.006,241.7298.3%$8,114.24
21*COMPACTED AGGREGATE NO. 53 BASE3,500TON$43.00$150,500.00$45.25$158,375.00753.99$34,118.053,829.08109.4%$173,265.87
22*MILLING ASPHALT, 2 IN4,410SYS$3.30$14,553.00$3.50$15,435.004,820.50$16,871.754,820.50109.3%$16,871.75
23*HMA PATCHING, TYPE B, UNDISTRIBUTED150TON$155.00$23,250.00$159.00$23,850.000$0.0000.0%$0.00
24*HMA INTERMEDIATE, TYPE B870TON$92.00$80,040.00$100.00$87,000.00846.29$84,629.00846.2997.3%$84,629.00
25*HMA SURFACE, TYPE B940TON$98.00$92,120.00$108.00$101,520.00971.52$104,924.16971.52103.4%$104,924.16
26ASPHALT FOR TACK COAT9,400SYS$1.00$9,400.00$1.00$9,400.0010,048.07$10,048.0710,048.07106.9%$10,048.07
27*RESTORATION, TYPE I (TOPSOIL, SEEDING, & ECB)2,875SYS$12.50$35,937.50$12.80$36,800.002,996.64$38,356.992,996.64104.2%$38,356.99
28*RESTORATION, TYPE II (TOPSOIL, SEEDING, & TRM)135SYS$22.87$3,087.45$23.30$3,145.500$0.0000.0%$0.00
29*SWALE GRADING, UNDISTRIBUTED250LFT$20.00$5,000.00$20.50$5,125.00380$7,790.00380152.0%$7,790.00
30PLANT, DECIDUOUS TREE, 3.5 IN, UNDISTRIBUTED5EACH$1,000.00$5,000.00$1,000.00$5,000.000$0.0000.0%$0.00
31CONCRETE, SIDEWALK, 4 IN4SYS$83.00$332.00$83.00$332.0016.60$1,377.8016.60415.0%$1,377.80
32CURB AND GUTTER, CONCRETE, ROLL CURB5,540LFT$25.00$138,500.00$25.00$138,500.005,590$139,750.005,590100.9%$139,750.00
33PCCP SHOULDER, 9 IN547LFT$25.00$13,675.00$25.00$13,675.00530$13,250.0053096.9%$13,250.00
34*HMA FOR APPROACHES, TYPE B611SYS$168.00$102,648.00$180.00$109,980.00411.50$74,070.00716.50117.3%$128,970.00
35PCCP FOR APPROACHES, 6 IN161SYS$84.10$13,540.10$84.10$13,540.10127.20$10,697.52127.2079.0%$10,697.52
36*COMPACTED AGGREGATE FOR APPROACHES, 6 IN6TON$152.00$912.00$158.00$948.009$1,422.009150.0%$1,422.00
37RIPRAP, REVETMENT75SYS$165.00$12,375.00$165.00$12,375.0086.52$14,275.8086.52115.4%$14,275.80
38MAILBOX ASSEMBLY, REMOVE AND RESET, UNDISTRIBUTED33EACH$1,000.00$33,000.00$1,000.00$33,000.0033$33,000.0033100.0%$33,000.00
39CASTING, FURNISH AND ADJUST TO GRADE9EACH$1,600.00$14,400.00$1,600.00$14,400.009$14,400.009100.0%$14,400.00
40*STRUCTURE BACKFILL, TYPE 1670CYS$35.00$23,450.00$49.95$33,466.500$0.00670100.0%$33,466.50
41PIPE, TYPE 2, 4 IN, UNDISTRIBUTED100LFT$18.00$1,800.00$18.00$1,800.000$0.008888.0%$1,584.00
42PIPE, TYPE 2, 6 IN, UNDISTRIBUTED50LFT$25.00$1,250.00$25.00$1,250.000$0.0000.0%$0.00
43PIPE, TYPE 2, DIP, 12 IN55LFT$190.00$10,450.00$190.00$10,450.000$0.0057.20104.0%$10,868.00
44PIPE, TYPE 2, CONCRETE, 12 IN590LFT$104.00$61,360.00$104.00$61,360.000$0.00547.5092.8%$56,940.00
45PIPE, TYPE 2, CONCRETE, 18 IN726LFT$135.00$98,010.00$135.00$98,010.000$0.00679.5093.6%$91,732.50
46PIPE, TYPE 2, CONCRETE, 24 IN308LFT$148.00$45,584.00$148.00$45,584.000$0.0027789.9%$40,996.00
47PIPE, TYPE 4, PERFORATED PVC, 6 IN UNDERDRAIN400LFT$65.00$26,000.00$65.00$26,000.000$0.00400100.0%$26,000.00
48FLARED END SECTION, 12 IN W/ GRATE4EACH$2,000.00$8,000.00$2,000.00$8,000.000$0.00375.0%$6,000.00
49FLARED END SECTION, 18 IN W/ GRATE1EACH$2,200.00$2,200.00$2,200.00$2,200.000$0.001100.0%$2,200.00
50FLARED END SECTION, 24 IN W/ GRATE2EACH$2,800.00$5,600.00$2,800.00$5,600.000$0.002100.0%$5,600.00
51INLET, TYPE I8EACH$2,500.00$20,000.00$2,500.00$20,000.000$0.008100.0%$20,000.00
52STORM SEWER MANHOLE, TYPE II, 48 IN DIA11EACH$4,900.00$53,900.00$4,900.00$53,900.000$0.0011100.0%$53,900.00
53STORM SEWER MANHOLE, TYPE II, 60 IN DIA2EACH$7,200.00$14,400.00$7,200.00$14,400.000$0.002100.0%$14,400.00
54STORM SEWER MANHOLE, TYPE II, 96 IN DIA1EACH$14,000.00$14,000.00$14,000.00$14,000.000$0.001100.0%$14,000.00
55SANITARY SERVICE CONNECTION, TYPE 1, (UNDISTRIBUTED)10EACH$1,100.00$11,000.00$1,100.00$11,000.000$0.00220.0%$2,200.00
56SANITARY SERVICE CONNECTION, TYPE 2, (UNDISTRIBUTED)10EACH$1,500.00$15,000.00$1,500.00$15,000.000$0.00110.0%$1,500.00
57THERMOPLASTIC, SOLID WHITE, 4 IN, RECESSED2,865LFT$1.81$5,185.65$1.81$5,185.653,593$6,503.333,593125.4%$6,503.33
58THERMOPLASTIC, SOLID YELLOW, 4 IN, RECESSED2,640LFT$1.81$4,778.40$1.81$4,778.403,310$5,991.103,310125.4%$5,991.10
59TRANSVERSE MARKING, THERMOPLASTIC, STOP BAR, WHITE, 24 IN26LFT$13.58$353.08$13.58$353.0828$380.2428107.7%$380.24
60*TRAFFIC CONTROL1LS$20,000.00$20,000.00$21,150.00$21,150.000.75$15,862.501100.0%$21,150.00
TOTAL$728,916.99$1,564,996.77
Pay Estimate Report — Reconciliation Summary
ItemAmount
Awarded Contract Value$1,540,184.18
Current Contract Value$1,564,996.77
Current Awarded Change Order Value$24,812.59
CO #1$69,162.55
CO #2($44,349.96)
Percent Complete (Awarded)101.61%
Percent Complete (Current)100.00%
Retainage$0.00 (0.00%)
Original Contract$1,540,184.18
Total Change Orders$24,812.59
Revised Contract$1,564,996.77
Completed to Date$1,564,996.77
Total Earned Less Retainage$1,564,996.77
Less Previous Requests$752,471.81
Liquidated Damages Assessed($25,000.00)
Current Amount Due$787,524.96

AIA Document G702 — Application and Certification for Payment

Packet Page 6

AIA G702 — Header Information (Application No. 5, Page 1 of 3)
FieldValue
To OwnerChristopher B. Burke Engineering, LLC, 214 South Main Street, Suite 201, Crown Point, IN 46307
Project3641752 – Shades Subdivision - Phase 2
Application No.5
Period To7/27/2026
From ContractorRieth-Riley Construction Co., Inc, 7500 W. 5th Ave., Gary, IN 46406
Contract ForAsphalt Paving and Other Site Related Work
Contract Date2/26/2025
Vendor ID #2226
Invoice #3641752 05
Invoice Amount$787,524.96
Retainage$0.00
Amount Due$787,524.96
Contractor's Application for Payment — Summary Lines 1–9
LineDescriptionAmount
1Original Contract Sum$1,609,346.73
2Net change by Change Orders($44,349.96)
3Contract Sum to Date (Line 1 ± 2)$1,564,996.77
4Total Completed & Stored to Date (Column G on G703)$1,564,996.77
5aRetainage: 10% of Completed Work$0.00
5bRetainage: 10% of Stored Material$0.00
Total Retainage (Lines 5a + 5b)$0.00
6Total Earned Less Retainage (Line 4 Less Line 5 Total)$1,564,996.77
7Less Previous Certificates for Payment (Line 6 from prior Certificate)$752,471.81
8Current Payment Due$787,524.96
9Balance to Finish, Including Retainage (Line 3 less Line 6)$0.00
Change Order Summary (as shown on G702)
ItemAdditionsDeductions
Total changes approved in previous months by Owner$6,579.89$0.00
Total approved this Month$0.00($50,929.85)
Totals$6,579.89($50,929.85)
Net Changes by Change Order($44,349.96)

Contractor's Certification: The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief the Work covered by this Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due.

Signed by: Zachary Sassman, Assistant Secretary. State of Indiana, County of Lake. Subscribed and sworn before Notary Public Diana M. Buikema on August 26, 2026. Commission expires January 12, 2033 (Commission No. NP0695274).

Architect's Certificate for Payment: In accordance with the Contract Documents, based on on-site observations and the data comprising the application, the Architect certifies to the Owner that to the best of the Architect's knowledge, information and belief the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the Amount Certified.

Amount Certified: $787,524.96. Architect signature line is blank/unsigned on this document.


AIA Document G703 — Continuation Sheet (Summary)

Packet Pages 7–8

This 2-page continuation sheet (Application #5, Period 7/27/2026, Project Shades Subdivision - Phase 2, RR Job #3641752) itemizes the same 60 contract line items already reproduced in full in the “CBBEL Pay Estimate Report” section above. To avoid reproducing the identical item-by-item figures a second time, only the sheet totals are shown below; see the Pay Estimate Report for full line-item detail.

AIA G703 Continuation Sheet — Totals (Page 3 of 3, Final Grand Total)
ColumnAmount
C — Scheduled Value (Total)$1,564,996.77
D — Work Completed, From Previous Application$836,079.79
E — Work Completed, This Period$728,916.98
F — Materials Presently Stored$0.00
G — Total Completed and Stored to Date (D+E+F)$1,564,996.77
Percent Complete100.00%
H — Balance to Finish (C−G)$0.00
I — Retainage (10% rate column)$156,499.68

Note: the retainage figure shown in Column I of the G703 form ($156,499.68, calculated at the form's printed 10% rate) differs from the $0.00 retainage shown elsewhere in this packet (Change Order, CBBEL letter, Pay Estimate Report, and G702 Line 5). This appears to be a static/unedited rate label carried over on the continuation sheet template rather than the actual retainage applied to this final pay request, which is $0.00 per every other document in this packet.


Contractor's Progress Estimate / Invoice No. 5 (Summary)

Packet Pages 9–10

This is Rieth-Riley Construction Co., Inc.'s own backup invoice (Progress Estimate #005, Invoice #3641752-005, dated 6/29/2026, period covered through 7/1/26), which again itemizes the same 60 contract line items already reproduced in full above. Only the invoice header and totals are shown below; see the CBBEL Pay Estimate Report for full line-item detail.

Progress Estimate #005 — Header Information
FieldValue
ContractorRieth-Riley Construction Co., Inc, 7500 W 5th Ave, Gary, IN 46406, 219-977-0722
Progress Estimate #005
Customer #2226
Invoice #3641752-005
Date6/29/2026
Period CoveredThrough 7/1/26
JobShades Subdivision Improvement
AttentionThomas Gordan (Christopher B. Burke Engineering, LLC), 214 South Main Street, Suite 201, Crown Point, IN 46307
Progress Estimate #005 — Totals
ItemAmount
This Estimate$728,916.99
Job to Date$1,564,996.77
Retainage$72,891.71
Balance$787,524.96

Final Waiver of Lien and Contractor's Affidavit

Packet Page 11

Final Waiver of Lien

Final Waiver of Lien — Header Information
FieldValue
StateIndiana
CountyLake
Employed ByChristopher B. Burke Engineering, LLC
WorkAsphalt Paving and Other Site Related Work
PremisesShades Subdivision - Phase 2
OwnerTown of Cedar Lake
Consideration AmountSeven Hundred Eighty-Seven Thousand Five Hundred Twenty-Four Dollars and Ninety-Six Cents ($787,524.96)

The undersigned, for and in consideration of the above amount and other good and valuable consideration, the receipt whereof is hereby acknowledged, does hereby waive and release any and all lien or claim of, or right to, lien, under the statutes of the State of Indiana, relating to mechanics' liens, with respect to and on the above-described premises, and the improvements thereon, and on the material, fixtures, apparatus or machinery furnished, and on the moneys, funds or other considerations due or to become due from the owner, on account of labor, services, material, fixtures, apparatus or machinery herein furnished, or which may be furnished at any time hereafter, by the undersigned for the above-described premises.

Given under hand and seal this 26th day of August, 2026.

Signature and Seal: Zachary Sassman, Assistant Secretary

NOTE (as printed on the form): All waivers must be for the full amount paid. If waiver is for a corporation, corporate name should be used, corporate seal affixed and title of officer signing waiver should be set forth. If waiver is for a partnership, the partnership name should be used, partner should sign and designate himself as partner.

Contractor's Affidavit

State of Indiana, County of Lake. The undersigned, being duly sworn, deposes and says that he is Assistant Secretary of Rieth-Riley Construction Co., Inc., who is the contractor of the Asphalt Paving and Other Site Related Work on the building located at 7408 Constitution Ave, Cedar Lake, IN, owned by Town of Cedar Lake, on which he has received payment of $752,471.81 prior to this payment. That the total amount of the contract including extras is $1,564,996.77. That all waivers are true, correct and genuine and delivered unconditionally and that there is no claim either legal or equitable to defeat the validity of said waivers. The following are the names of all parties who have furnished material or labor, or both, for said work and all parties having contracts or subcontracts for specific portions of said work, and the amount due or to become due to each.

Subcontractor Payment Status
Name What For Contract Price Amount Paid This Payment Balance Due
Rieth-Riley Construction Co., IncAsphalt paving and other site related works$977,326.25$310,155.52$642,170.73$0.00
Blood HoundSubcontractor$3,178.00$2,860.20$317.80$0.00
CE HughesSubcontractor$4,632.74$4,169.47$463.27$0.00
DLZSubcontractor$40,869.00$29,232.00$11,637.00$0.00
Modern EdgeSubcontractor$63,218.93$0.00$63,218.93$0.00
TCSSubcontractor$22,300.05$0.00$22,300.05$0.00
ZieseSubcontractor$453,471.80$406,054.62$47,417.18$0.00
Total Labor and Material to Complete$1,564,996.77$752,471.81$787,524.96$0.00

That there are no other contracts for said work outstanding, and that there is nothing due or to become due to any person for material, labor or other work of any kind done or to be done upon or in connection with said work other than above stated.

Signed this 26th day of August, 2026.

Signature: Zachary Sassman, Assistant Secretary. Subscribed and sworn before Notary Public Diana M. Buikema, Resident of Lake County, Indiana, on the 26th day of August, 2026. Commission Expires January 12, 2033 (Commission No. NP0695274).

Rieth-Riley Job #: 3641752


Rieth-Riley Letter — Acknowledgement of Outstanding Repairs

Packet Page 12

Rieth-Riley Construction Co., Inc.
7500 W. 5th Ave., Gary, IN 46406 — Phone: (219) 977-0722 — www.rieth-riley.com

August 25, 2026 (Sent via Email)

Mr. Thomas Gordon
CBBE LLC
214 South Main Street
Crown Point, IN 46307

Re: Cedar Lake Shades Phase 2 — Acknowledgement of outstanding repairs at Shades Subdivision

Mr. Gordon

Rieth-Riley Construction Co., Inc (“Rieth-Riley”) submits acknowledgement of outstanding repairs related to the work on the above contract. The repair work will be completed in Fall of 2026.

  1. Cracked RCP Pipe fix to be approved by CBBE before Ziese mobilizes for repair.
  2. Once the repair method is approved and the repair is completed, Ziese will provide a video inspection of the entire RCP pipe installed on the project so CBBE can confirm all previous punch list items have been addressed.
  3. Outstanding subcontractor waivers to be provided to CBBE and the Town once received by Rieth-Riley.

Respectfully,

Tyler Platusic
Project Manager