Cedar Lake Plan Commission Work Session Meeting Minutes

Cedar Lake Town Hall • 7408 Constitution Avenue, Cedar Lake, Indiana

Call To Order:

Mr. Kiepura called the Plan Commission Work Session to order on Wednesday, January 7, 2026, at 6:00 pm with its members attending on-site. The Pledge of Allegiance was said by all.

Roll Call:

Members Present via Zoom: None

Members Present On-Site: Chuck Becker; Greg Parker; Robert Carnahan; Pete Swick; James Hunley; Jerry Wilkening, Vice President; and John Kiepura, President. A quorum was attained.

Also present: Luke Sherry, Town Engineer; David Austgen, Town Attorney; Ben Eldridge, Town Manager; Tim Kubiak, Director of Operations; Cheryl Hajduk, Recording Secretary

Absent: None

Old Business:

1. 2025-27 – M&L Adventures, LLC – Rezone and Preliminary Plat

Petitioner: Vis Law, 12632 Wicker Avenue, Cedar Lake, IN 46303
Owner: M&L’s Adventure, LLC c/o Vis Law, 12632 Wicker Avenue, Cedar Lake, IN
Vicinity: 10715 W 133rd Ave, Cedar Lake, IN 46303
Parcel ID #45-15-28-126-017.000-014 and 45-15-28-126-023.000-014

Mr. Kiepura commented the first order of old business is for Petitioner is requesting a rezone of the property and Preliminary Plat for a one-lot subdivision.

Attorney Nathan Vis on behalf of M&L Adventures, along with Mr. Ryan Torrenga from Torrenga Engineering commented they are moving toward:

Mr. Torrenga explained the site’s main challenge is managing off-site water flowing from the west and south into a low-lying depressional area requiring detention, swales, and overflow control to prevent neighboring flooding.

Mr. Gelatka commented the maximum number of businesses anticipated in the building is about seven, based on known tenant spaces, to avoid open-ended usage that could create issues.

2. 2025-37 – Quick Run Gas Station

Petitioner: DVG Team, 1155 Troutwine Road, Crown Point, IN
Owner: Shamir Manhani, 9028 Parkside Lane, St. John, IN
Vicinity: 13795 Wicker Ave., Cedar Lake, IN; 13775 Wicker Ave., Cedar Lake, IN
Parcel ID# 45-15-28-302-005.000-014; 45-15-28-302-004.000-014; 45-15-28-302-003.000-014

Mr. Kiepura commented the next order of old business is for Petitioner is requesting Site Plan review for a two-lot subdivision.

Mr. Max Jeske, DVG, representing Shamir Manhani, 1155 Troutwine Road, Crown Point, IN.

Mr. Sherry commented the project is in good shape with preliminary plat approval already granted and no major outstanding issues ahead of final plat approval expected next month.

Mr. Kubiak indicated no significant concerns with the site plan or public notifications, suggesting a smooth path to final approval.

New Business:

1. 2025-34 – Pinto Concrete/Serrano – Site Plan Waiver

Owner/Petitioner: Luis E. Serrano, 1927 Spruce Cir., Munster, IN 46321
Vicinity: 12644 Wicker Avenue, Cedar Lake, IN 46303
Parcel ID# 45-15-20-229-019.000-014

Mr. Kiepura commented the first order of new business is for Petitioner is requesting a Site Plan approval.

Mr. Luis Serrano, 1927 Spruce Cir., Munster, IN 46321 presented requests for site plan approval for concrete company operations including vehicle parking.

Mr. Kubiak commented the building at 12644 Wicker Avenue, rectifying prior noncompliance after a red tag was issued.

Mr. Serrano confirmed using the back area for parking 10 to 12 trucks currently, with employees parking cars in front.

2. 2025-44 – Culler – Preliminary Plat

Petitioner: Vis Law, 12632 Wicker Avenue, Cedar Lake, IN 46303
Owner: Joshua Culler, c/o Vis Law, 12532 Wicker Avenue, Cedar Lake, IN
Vicinity: 9117 137th Avenue, Cedar Lake, IN 46303
Parcel ID#: 45-15-27-332-003.000-014

Mr. Kiepura commented the next order of new business is for Petitioner is requesting a Preliminary Plat for the Winding Creek Subdivision.

Attorney Nathan Vis appeared on behalf of Joshua Culler, 12632 Wicker Avenue, Cedar Lake, and the other affected property owners (the Vespas, Seams, and Wards). In December of 2025, the Commission determined the amendment should be treated as a major change requiring a preliminary plat process and public hearing. No changes have occurred to the property or the proposal since December. The adjustment resolves a longstanding irregular lot configuration; all affected property owners are in agreement.

Mr. Kubiak commented there are no utilities or public infrastructure involved — the affected lots are essentially within adjacent private backyards.

Mr. Sherry noted that a couple of drainage easements will be retained, which he confirmed is sufficient.

3. 2025-46 – Storsafe of Cedar Lake

Owner/Petitioner: Storsafe of Cedar Lake, LLC, 5301 Dempster St., Suite 300, Skokie, IL
Vicinity: 13649 Wicker Avenue, Cedar Lake, IN 46303
Parcel ID#: 45-15-28-157-008.000-014

Mr. Kiepura commented the next order of new business is for Petitioner is requesting driveway connection to Osborne Street to Storsafe of Cedar Lake.

Ms. Nicole Bjan, DVG Team, appeared on behalf of Storsafe of Cedar Lake. The petitioner requested conceptual review of a proposed new driveway connection from Osborne Street (southern end of Lakeview Business Park) into the Storsafe property. Two new storage buildings have recently been constructed at the rear of the site, and the Osborne Street connection would improve traffic circulation and reduce left-turn movements from U.S. 41. Osborne Street currently terminates at the Storsafe property line. The proposed driveway would be approximately 24 feet wide (12 feet in, 12 feet out) with tapers matching the existing pavement. A gated entrance — consistent with the existing card-access gate on U.S. 41 — would be installed. The Lakeview Business Park road network also connects to Alexander Street, providing an additional route to 141st Street.

The Commission expressed general conceptual support for the connection.

Mr. Jack Huls, DVG, commented we would like an entrance point to Storsafe and a stormwater concern was noted: an existing detention area on the east portion of the property was originally designed as part of the Lakeview Business Park detention system and may require engineering review as the site develops further and indicated the detention pond at Lakeview Business Park covers the east two-thirds of the Storsafe site.

4. 2025-47 – Wedding Development – Site Plan

Owner/Petitioner: Kim Wedding, Wedding Development, LLC, 15590 Hendricks Street, Lowell
Vicinity: 13791 Osborn Street, Cedar Lake, IN 46303
Parcel ID#: 45-15-28-305-005.000-014

Mr. Ryan Torrenga of Torrenga Engineering, 907 Ridge Road, Munster, appeared on behalf of the Petitioner. Owner Casey Wedding was also present. The project proposes a single industrial building (concrete business) with front parking. Stormwater is managed through the existing Lakeview Business Park detention pond.

Mr. Sherry commented he recently received and the engineer reported most outstanding items are minor clerical corrections or requests for additional information.

Mr. Sherry commented the primary unresolved issue is whether curb and gutter are required for the parking lot. Town Engineer stated it is a requirement for parking lots. The petitioner noted that an existing building at the park (Seal Tight) was constructed without curb and gutter.

Mr. Kubiak acknowledged uncertainty about whether it is required under the PUD agreement or the zoning ordinance and committed to researching the matter if curb and gutter is required.

Mr. Austgen noted that if curb and gutter is required under the PUD agreement, the petitioner would need to request a variance through a public hearing process. The Commission expressed a general preference for consistency throughout the business park but deferred a final determination pending staff research. The Commission also cautioned against relying on future development plans to justify omitting infrastructure now.

Mr. Torrenga commented new swales will be created to go in by the property and by the north side of the building.

5. 2025-48 – Barbara Littles Salon – Site Plan Approval

Petitioner: Barbara Littles, 9602 W. 135th Place, Cedar Lake, IN 46303
Owner: Tommy Littles, 9602 W. 135th Place, Cedar Lake, IN 46303
Vicinity: 9602 W 135th Place, Cedar Lake, IN 46303
Parcel ID# 45-15-28-280-006.000-014

Mr. Kiepura commented the next order of old business is for Petitioner is requesting Site Plan approval to move hair salon to an attached garage at their home.

Mr. and Mrs. Barbara Littles, 9602 W. 135th Place, Cedar Lake, IN presented request to move her hair salon to an attached garage at their home.

Letters of Credit:

1. Crown Point Community School Corporation – Notice of Cancellation for Letter of Credit set to expire on February 19, 2026 in the amount of $312,389.00

Town Engineer Mr. Sherry reported that the letter of credit should not be allowed to expire. A letter of comment was sent months ago with outstanding items; a resubmittal was received approximately two days prior and is under review. The Commission noted that a significant portion of the bonded amount covers a water main installation on the school site, which requires conversion to a maintenance bond for a three-year maintenance period once the work is accepted. The Commission directed Town Manager Eldridge to contact Skillman (the school corporation’s engineer) and request their attendance at the January 21, 2026 meeting to address the outstanding items and establish a timeline for completion or bond extension.

2. Centennial Estates Phase 1 – Maintenance Letter of Credit set to expire February 15, 2026. Recommendation of Town Engineer to allow Letter of Credit to expire

Town Engineer Mr. Sherry reported that the developer completed all required items. Staff recommendation is to allow the maintenance letter of credit to expire by its terms at the end of the maintenance period.

The Commission discussed the status of Rose Garden Subdivision punch list items, which were due within 90 days (approximately January 9, 2026). Town Engineer Luke reported that the developer submitted a comment response letter around Christmas and made substantial progress on concrete replacement — approximately 95% complete, with the equivalent of roughly 200 yards of concrete replaced. Outstanding items deferred to spring include an asphalt path and repair of sinkholes around storm sewers. Director of Operations Kubiak and the Commission believe the deadline given was actually six months, not 90 days; staff was directed to confirm the actual deadline on record. All performance bonds have been renewed for one year, and the Town’s financial security is in place.

King Drive / Summer Winds (ponding concerns):

A resident concern about flooding on King Drive was raised. Mr. Kubiak explained that the final asphalt coat has not yet been installed, leaving storm drain basins approximately 1.5 inches below finished grade. Temporary silt baskets remain in place. Ponding near storm drains is a temporary condition that dissipates within hours and is not indicative of a drainage failure. The situation is expected to be resolved upon completion of the final asphalt course.

Tabled:
2023-18 Bay Bridge
2023-19 Founders Creek
2023-20 Red Cedars

Public Comment:

None was had.

Adjournment:

Mr. Kiepura adjourned the meeting at 7:27 pm.

Town of Cedar Lake Plan Commission

 
John Kiepura, President
 
Jerry Wilkening, Vice-President
 
Pete Swick, Member
 
James Hunley, Member
 
Robert Carnahan, Member
 
Greg Parker, Member
 
Chuck Becker, Member

ATTEST:

 
Cheryl Hajduk, Recording Secretary